Project Delivery

Private hospital – North London

Architect: Sonnemann Toon Architects
Contractor: Collins Construction

Working with a private client working as Director for the main Contractor, Colin delivered a multi-phase scheme over 2 floors to provide new MRI, CT and two Cath Labs, one of which was created as a hybrid theatre, as part of a larger scheme incorporating a new patient gym, new offices, staff breakout and ancillary areas. Situated within a live environment, a high level of coordination was required to ensure minimal interaction with staff, patients and visitors was maintained at all times, and hoarding demarcating the construction sites were constructed to minimise dust migration between the spaces.